Projects
Canberra Hospital Building 8 Expansion
Building 8 at the Canberra Hospital is a four-storey new build. It forms part of the ongoing work on the more than $600 million Canberra Hospital Expansion Project
Canberra Hospital Building 15
Starting with the demolition of the existing building and its replacement with a two-storey modular construction. A total of 96 individual building modules were manufactured in Queensland and transported to Canberra over eight weeks. All modules were installed onsite, with the base building erected in under four months.
Canberra Hospital Building 28
The new two storey administration building is 1,200m2 and includes a lift and lobby area along with office facilities and amenities. A rapid build solution was required to achieve completion under very tight time constraints as Building 28 was the first stage of the Spire project, which includes several other major hospital upgrades.
Jerrabomberra High School
The new high school in Jerrabomberra is a Years 7 to 12 comprehensive high school.
Daramalan College Performing Arts Centre
The building will accommodate a black box theatre with more than 150 seats, a drama studio, music teaching rooms and sound-insulated practice studios.
Deakin One
The Deakin.One commercial development is a three-storey office building which completes the Deakin masterplan.
The Anglican School Googong - Senior School Hub West Wing
New west wing of the Senior Hub at Googong Anglican School. The west wing features four general learning spaces, a science room, staff pod and three technical rooms. The classrooms are all interlinked by a large central common breakout space.
Winnunga Nimmityjah Aboriginal Health & Community Services
The project comprises a two-storey new build with basement parking, incorporating rooms for counselling, GP consulting, dental surgery, breakout spaces and staff areas, as well as larger community spaces.
Estate Apartments Forrest
The development includes 89 apartments spread across one three-storey and two four-level apartment blocks over a shared basement.
The Henry Retirement Village
The project comprises of a new boutique retirement village featuring 46 single storey townhouses and 54 independent living units apartments split across two buildings (one four storeys and the other five storeys) offering basement carparking, community club house and landscaped surrounds.
The Canberra Hospital Building 3 Ward 14A & 14B
The project consists of new Haematology Ward to accommodate 21 patients, largely comprised of single bedrooms and a purpose-built lead lined Iodine treatment room.
Regatta Point Café Extension
New 140 capacity function centre and Café.
Proximity
Residential apartment complex consisting of 159 units, located in Bruce ACT.
Oracle
Residential apartments consisting of 474 apartments and 5 commercial units over the three stages, Located in Belconnen ACT.
Common Grounds Development Dickson
6 storey building will consist of 40 affordable and social housing units with a mix of one, two- & three-bedroom layouts, as well as a cafe, communal green space and social services.
Aviation House
Total Hydraulics Package for 8 storey office building including siphonic drainage and high pressure gas.
St Andrews Aged Care Facility
Consisting of the hydraulic services to the new 76 rooms and common areas for this development situated at Hughes.
War Memorial of Australia
Photographic annexe- A Federal Government initiative consisting of trade waste facilities for photographic enhancement and development
Kingston Boat Harbour
Located at Travillian Quay, Kingston Boat Harbour, Kingston, ACT.
Lakefront Apartments
Residential Apartments consisting of 145 units, located in Kingston, ACT.
Brindabella Christian College Junior School
Hydraulic & gas services to new junior school building, Lyneham, ACT.
ANU College of Law
Hydraulic services to the existing ANU Law building, ACTON, ACT.
Burgmann College Demountables
Installation of sanitary drainage, water & storm-water to new demountable building, Gungahlin, ACT.
Canberra Grammar School
Storm-water drainage to new building, water & hydrant services to new building, Red Hill, ACT.
Canberra Imaging Group - Bruce Private Hospital
Fitout of new medical facility at Calvary Private Hospital, Bruce, ACT.
Marigal Gardens Leisure Centre
Installation of sanitary drainage, plumbing, water, storm-water & gas to new leisure centre & independent living units, Kambah, ACT.
Marist College 50th Jubilee Redevelopment Stage 1 & 2
Hydraulic services to new building, including water, sanitary & trade waste, Pearce, ACT.
Narrabundah College Transportable
Installation of in-ground hydraulic services to new transportable classrooms, Narrabundah, ACT.
Albert Moore Gardens – Bimbimbie Residential Aged Care Facility, Merimbula, NSW
Refurbishment of existing aged care facility, including water, gas, sanitary drainage, plumbing & storm-water, Merimbula, NSW.
Fred Ward Gardens – Residential Aged Care Facility
Refurbishment of existing aged care facility, Curtin, ACT.
Iskia Mixed Development
New 8 storey residential development with retail shops on ground floor, Campbell, ACT.
Amala Aged Care Facility
Refurbishment of existing aged care facility, Curtin, ACT.
Gungahlin Eastlakes Football Club
Hydraulic Services to new football club in Gungahlin, ACT.
Southcare Helicopter Facility – Medical & Services Hanger
Installation of S.Q.I.D & adjust hydraulic services to suit new hanger layout, Hume, ACT.
ANU Student Accommodation
This project is the first of its kind within Australia. Consisting of 230 containers, six storeys high were being used as student Accommodation. The Hydraulic package was a total design & Construct with the external work associated with the relocation of the authorities 300mm DICL water main. As well as a pipe burst for enlargement of a 150mm to 250mm sewer main for Actew AGL.
Samoan High Commission
Hydraulic services & storm-water to new building, Yarralumla, ACT.